Choosing a Temporary QCUL Production Rollback Checkpoint

The temporary QCUL checkpoint option creates a short-lived, operation-scoped production restore point before installation so the tested push can be undone from QCUL during the configured window.

Step-by-step procedure

  1. In the tested update’s production protection controls, choose Create a temporary QCUL rollback checkpoint.
  2. Confirm the configured Undo Production Push window in Settings is appropriate.
  3. Select Push to Production and allow checkpoint creation/validation to complete before installation begins.
  4. Do not interrupt the checkpoint phase unless the UI reports a safe paused/attention state.
  5. After a successful push, use Undo Production Push only while the checkpoint remains valid and no newer production operation supersedes it.

Production does not change until it is valid

Checkpoint capture/validation occurs before the tested package is installed. If checkpoint creation fails, QCUL stops rather than changing production without the protection you selected.

It is intentionally temporary

The checkpoint expires after the configured 10–240 minute window and is removed with the laboratory. Keep a real full-site backup regardless.

Production change rule

For Choosing a Temporary QCUL Production Rollback Checkpoint, the live site should change only through the explicit tested-item production workflow after current readiness checks pass. Do not substitute a new package, skip the review/protection decision, or run a second production action while QCUL already owns an active push/rollback state.


Community Discussion

Want to compare update-testing workflows, share practical tips, or discuss how you use this QCUL feature? Visit the QC Update Laboratory Community. For private support, bug reports, account-specific issues, or feature requests, use the QuantaCade support system.