Resuming an Interrupted Production Push
Production push work is restartable across bounded requests; if the browser/request is interrupted, QCUL preserves operation state so you can continue instead of launching a second production change.
Step-by-step procedure
- Reopen QC Update Laboratory → Laboratory on production.
- Read the saved production state/message. Do not start a second push.
- Use the displayed resume/continuation action if QCUL says the operation is restartable.
- If maintenance/site availability was changed and needs explicit recovery, use Restore Site Availability only after reviewing the current live state.
- Complete validation and live review before considering the operation finished.
Production work has priority
QCUL’s heavy-operation locks prevent concurrent lab/production work from racing. Resume the existing production operation or rollback to a defined end state before starting other QCUL actions.
Production change rule
For Resuming an Interrupted Production Push, the live site should change only through the explicit tested-item production workflow after current readiness checks pass. Do not substitute a new package, skip the review/protection decision, or run a second production action while QCUL already owns an active push/rollback state.
Community Discussion
Want to compare update-testing workflows, share practical tips, or discuss how you use this QCUL feature? Visit the QC Update Laboratory Community. For private support, bug reports, account-specific issues, or feature requests, use the QuantaCade support system.